Sunday, September 2, 2012

500,000 volt line opened under load:


This is the 500 kV Eldorado Substation near Boulder City, Nevada. It shows a three-phase motorized air disconnect switcher attempting to open high voltage being supplied to a large three phase shunt line reactor.


(by gsmac1969)

No comments:

Post a Comment